Catalog desk

Contact Converse catalog desk

Send last family, carton count, size run and channel. Stock quotes return in 1 business day; OEM packs in 5; compliance dossiers in 3.

Map of Converse catalog desk and carton dock

Address

Converse Catalog Desk
1 North Star Way
Boston, MA 02210
United States

Desk hours

Monday–Friday 09:00–17:30 ET
Stock RFQ: 1 business day
OEM proposal: 5 business days
Compliance dossier: 3 business days

Warehouse map illustration for Converse carton dock

What to put on the form

Last family (All Star, Chuck 70, skate, basketball, hiking), carton floor (48 mixed or 24 skate wall pack), US/EU/UK size run, channel (retail, e-commerce, club-team, wholesale, brand-OEM) and target market. Hiking membrane requests must say PU 8,000 mm hydrostatic head or named GORE-TEX. Youth US cartons must mention CPSIA.

If the PO mixes vulcanized All Star with Phylon basketball, split the carton. The drop (0 mm versus 8 mm) and midsole compound cannot share one size-run CSV. Skate cupsole 4 mm drop is a third file. The desk will not merge those three into a single mixed 48-pair carton.

Private-label OEM is foxing tint, lining color, hangtag and carton print at 300 pairs per color after a 12-pair fit sample. Last geometry stays locked. Stock wholesale that only needs a color already on the line card should not be filed as OEM; that path adds five days without changing the last.

Social: catalog updates post on the trade desk feed, not a consumer store locator. LinkedIn and email remain the RFQ path. Do not send last codes through a store-finder widget.

Carton RFQ form

Two-column fields match the quote file: name, email, company, country, product type, channel. The modal uses the same fields; this page adds the map and desk notes so a buyer can file without opening a dialog.

Required
Required
Valid email required
Required
Required
Required
Select a product type
Select a channel
Include last family, carton count and ship window

Stock items: quote within 1 business day. Custom / OEM projects: full proposal within 5 business days. Compliance documentation requests: dossier within 3 business days.